beautypg.com

Chapter 3 hardware installation, 1 installation steps – B&B Electronics EIRP610-2SFP-T - Manual User Manual

Page 18

background image

Hardware Installation

Chapter 3 Hardware Installation



3.1 Installation Steps


1. Unpack the Industrial switch

2. Check that the DIN-Rail clip is screwed onto the Industrial switch. If the DIN-Rail clip

is not screwed onto the switch, refer to the DIN-Rail Mounting section for DIN-Rail

clip installation. If wall or panel mounting is preferred, refer to Wall or Panel Mount

Plate Mounting section for plate installation.

3. To hang the switch on DIN-Rail track or to wall/panel mount the switch please refer to

the appropriate section for installation instructions.

4. Power on the Industrial switch. Please refer to the Wiring the Power Inputs section for

knowing the information about how to wire the power. The power LED on the Industrial

switch will light up. Please refer to the LED Indicators section for indication of LED

lights.

5. Prepare the twisted-pair, straight through Category 5 or above cable for Ethernet

connection.

6. Insert one end of RJ-45 cable (category 5 or above) into the switches Ethernet port (RJ-

45 port) and the other side of the RJ-45 cable into the network device‘s Ethernet port

(RJ-45 port), ex: Switch PC or Server. The LED on the Industrial switch will light up

when the cable is connected with the network device. Please refer to the LED

Indicators section for LED light indication.

[NOTE]

Make sure that the connected network devices support MDI/MDI-X. If they do not

support MDI/MDI-X a crossover cable may be required.

7. When all connections are set and LED lights all show in normal, the installation is

complete.




12

Manual Documentation Number EIRP610-2SFP-T

– 0912m

www.bb-elec.com

www.bb-europe.com