21. Hopper
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
229
Hopper (Cross Section) Example - All Models (Continued)
Figure 21AI Close Up - Inside hopper flange bolted
to inside hopper panel.
Figure 21AJ Self - Tapper inside hopper flange to
inside solid wall sheet.
After installing inside hopper panels, bolt the new style cooling floor brackets on to hopper sheets using
5/16"-1" bolts. Be sure that the four (4) notched brackets are evenly spaced. Inside hopper and floor
brackets can be tightened.
Install ladder to hopper panels using 5/16" bolts and nuts. Using outside ladder standoff, ladder must be
attached to hopper where the inside catwalk door is located.
Next install the grain flow gates to the hopper channels, just below the inner hopper, the bottom bolts in
the center set of holes. Use 5/16" bolts, tighten after installing.
Figure 21AK Bolting cool section floor
support to cool section floor beam.
Figure 21AL Hopper installed with emergency
discharge slide gates.