Vertical base channel right and left kits, Outside solid wall sheets, Sealing strip – Grain Systems PNEG-707GSI User Manual
Page 207

19. Tower Base
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
207
Vertical Base Channel Right and Left Kits
Install R.H. vertical base channels and L.H. vertical base channels to bottom of vertical channel columns.
Bottom of vertical base channel is angled. Attach short side of vertical base channel to jig clip with jig clip
extender.
Kits designed to shorten jack lift, improve safety.
Outside Solid Wall Sheets
Last ring of outside wall sheets and inside wall sheets on dryer are solid.
for assembly layout for placement.
Install outside solid wall sheets at base of dryer.
NOTE: After compression angle weldment is installed in later step, install inside solid wall sheets at base
of dryer.
Sealing Strip
Bolt sealing strip
to bottom of outside solid wall sheets.
Use 5/16" x 3/4" whiz lock bolts and nuts.
Figure 19D
Figure 19E Use jig clips extenders (arrow) to
attach vertical base channel to jig clip.
Figure 19F Sealing Strip
Figure 19G Sealing strip (arrow) is installed
to bottom of outside solid wall sheets.
A
B
A. R.H. Vertical base channel
B. L.H. Vertical base channel
Top
Top
Bottom
Bottom
(Kit generally comes with 3 pieces and hardware.)