Platforms – Grain Systems PNEG-707GSI User Manual
Page 132

10. Catwalks and Platforms
132
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
Platforms
See flat layouts in
Orientation Section on Page 32
for placement of platforms.
for platform.
Use 5/16" x 3/4" whiz lock bolts and nuts.
1. For each platform, install two (2) sections of catwalk flooring (with toeboards, diagonal supports,
vertical supports, and handrails.)
2. Bolt entry toeboard and end toeboard to catwalk flooring.
3. Bolt additional catwalk vertical support (at dryer) to horizontal catwalk support.
4. Bolt two (2) end handrails between catwalk vertical supports.
5. Bolt entry handrail extension to entry toeboard.
6. Bolt two (2) entry handrails to entry handrail extension and catwalk vertical support.
7. Bolt safety cage hoops to platform entry handrail extensions.
Check that all connections are made, and bolts are tight.
Additional Parts
One (1) entry toeboard
One (1) end toeboard
Two (2) end handrail
Two (2) entry handrail
One (1) handrail extension