Lift dryer, Chapter 9 lift dryer, Steps to lift dryer – Grain Systems PNEG-707GSI User Manual
Page 109: Vertical channel splice, Universal shim plate, Safety check before each lift

PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
109
9. Lift Dryer
See Orientation Section on Page 19
for dryer dimensions, components, wall sheet guidelines, etc.
Steps to Lift Dryer
Vertical Channel Splice
Splice vertical channels together with vertical
channel splices.
Use 3/8" x 1" galvanized steel bolts and nuts.
Figure 9A Vertical channel splice, 10 gauge.
Universal Shim Plate
To level dryer, shim dryer legs with universal shim
plates. Use universal shim plates only for leveling
jacks and completed dryer.
Figure 9B Universal shim plate. Use only for leveling
jacks and completed dryer.
Important Safety Precautions:
Dryer has sharp edges. These sharp edges may cause serious injury. Use
appropriate personal protective equipment. Use proper lifting techniques.
Safety check before each lift.
Tighten all bolts on dryer (except lower ladder parts).
Check for clearance from existing power lines, equipment and structures.
(See Orientation Section on Page 19.)
Do not lift dryer when it is windy enough to shift jacked dryer.
Move next set of vertical channels near to dryer, and pre-install vertical channel
splice to them.