Upper legs – Grain Systems PNEG-707GSI User Manual
Page 211

19. Tower Base
PNEG-707 12', 18', 24' and 30' GSI Commercial Tower Dryer
211
Upper Legs
See Figure 19A on Page 204 and
for placement of upper legs. Install upper legs
with support clip side to inside of dryer.
Outside dryer - Bolt upper leg through compression angle weldment to base stiffener weldment.
Use 5/8" x 2-3/4" grade 8 bolts and nuts.
Inside dryer - Bolt support clip on upper leg to compression angle weldment.
Use 5/8" x 1-1/2" grade 8 bolts and nuts.
Figure 19P
Figure 19Q Aligning upper leg to
base stiffener weldment.
Figure 19R Placing upper leg directly
under base stiffener weldment.
Lower leg
Upper leg
See also other documents in the category Grain Systems Conditioners:
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)