A.9.2

Rules for the Transition between Lightning Protection Zones
0 and 1

Rule for the Transition 0 <-> 1 (Lightning Protection Equipotential Bonding)

The following measures are suitable for lightning protection equipotential bonding
at the transition between lightning protection zone 0 <-> 1:

• Use grounded, spiralled, current-conducting metal strips or metal braiding, for

example, NYCY or A2Y(K)Y, as a cable shield at the start and end

• Lay the cables in one of the following ways:

-- in continuous metal pipes that are grounded at the start and end
-- in ducts of armored concrete with continuous armoring
-- on closed metal cable racks grounded at the start and end

• Use fiber-optic cables instead of lightning stroke current-carrying cables.

Additional Measures

If you cannot take the measures listed above, you must install a high-voltage
protector at transition 0 <->1 with a relevant lightning conductor. Table A-3 contains
the components you can use for high-voltage protection of your plant.

Table A-3

High-Voltage Protection of Cables with the Help of Surge Protection Equipment

Ser.

No.

Cables for ...

... equip transition point 0 <--> 1

with:

Order No.

1

3-phase TN-C system

1 piece of

DEHNbloc/3 lightning
conductor
phase L1/L2/L3 to PEN

900 110*
5SD7 031

3-phase TN-S system

1 piece of

DEHNbloc/3 lightning
conductor
phase L1/L2/L3 to PE

900 110*
5SD7 031

1 piece of

DEHNbloc/1 lightning
conductor
N to PE

900 111*
5SD7 032

3-phase TT system

1 piece of

DEHNbloc/3 lightning
conductor
phase L1/L2/L3 toN

900 110*
5SD7 031

1 piece of

DEHNgap B/n N-PE light-
ning conductor
N to PE

900 130*

AC TN-S system

2 pieces of DEHNbloc/1 lightning

conductor
phase L1 + N to PE

900 111*
5SD7 032

AC TN-C system

1 piece of

DEHNbloc/1 lightning
conductor
phase L to PEN

900 111*
5SD7 032