6-1

Automation System S7-400 Hardware and Installation

A5E00850741-01

Commissioning

Chapter Overview

Section

Description

Page

6.1

Recommended Procedure for First Startup

6-2

6.2

Checks Prior to Switching On for the First Time

6-3

6.3

Connecting a Programming Device (PG) to an S7-400

6-5

6.4

Switching On an S7-400 for the First Time

6-6

6.5

Resetting the CPU with the Mode Selector Switch

6-7

6.6

Cold, Warm, and Hot Restarts with the Mode Selector Switch

6-10

6.7

Inserting a Memory Card

6-11

6.8

Inserting a Backup Battery (Option)

6-13

6.9

Starting Up a PROFIBUS-DP Subnet

6-17

6.10

Installing Interface Submodules

(CPU 414-3, 414-3, 416-3, 417-4 and 417-4H)

6--18