FUJITSU SPARC T5120 User Manual
Page 192
166
SPARC Enterprise T5120 and T5220 Servers Service Manual • July 2009
FIGURE:
Installing a Power Supply in a SPARC Enterprise T5120 Server
8. Install the motherboard assembly.
See
“Install the Motherboard Assembly” on page 120
Note –
After replacing the power distribution board and powering on the system,
you must run the ALOM CMT setcsn and setcpn commands to set the
electronically readable chassis serial number and server part number.
9. At the ALOM CMT command line interface, use the setcsn command to set the
chassis serial number and the setcpn command to set the server part number
on the power distribution board.
The following is an example of the command-line dialog used to set the chassis
serial number and server part number for a SPARC Enterprise T5120 server.