beautypg.com

Install a battery, Related information, Servicing the scc module – FUJITSU SPARC T5120 User Manual

Page 140: Scc module overview

background image

114

SPARC Enterprise T5120 and T5220 Servers Service Manual • July 2009

▼ Install a Battery

1. Unpack the replacement battery.

2. Press the new battery into the battery holder on the motherboard.

Install with the positive side (+) facing upward, away from the motherboard.

3. Install PCIe/XAUI riser 2.

See

“Install a PCIe/XAUI Riser” on page 104

.

4. Use the ILOM setdate command to set the day and time.

See the Sun Integrated Lights Out Manager (ILOM) 3.0 Supplement for Sun SPARC
Enterprise T5120 and T5220 Servers
.

5. After returning the server to operation, check and reset the Solaris OS date.

Related Information

“Remove a Battery” on page 113

.

Servicing the SCC Module

These topics explain how to replace a faulty SCC module.

“SCC Module Overview” on page 114

“Remove a Faulty SCC Module” on page 115

“Install a New SCC Module” on page 116

SCC Module Overview

The SCC module contains system host ID, MAC addresses and some ILOM
configuration variables. You need to ensure that these values are available to the
service processor once servicing of the SCC module is complete:

Replacing the motherboard

-- When replacing the motherboard, you will transfer

the current SCC module from the faulty motherboard and to the new
motherboard.

See

“Remove the Motherboard Assembly” on page 118

and

“Install the

Motherboard Assembly” on page 120

for additional information.

This manual is related to the following products: