ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual
Page 74

Sensor Installation and Connection
3-13
Sliding the ring stabilizer onto the ring
3. Slide the ring stabilizer all the way around the ring until it is
about 4 inches (102 mm) from the welded metal band at the
other end of the ring.
Moving the ring stabilizer into position
4. Position the ring with the downstream edge (edge with the
holes) facing you.