Gradall 544D (9136-4003) Service Manual User Manual
Page 346

9.19
CAUTION
CAUTION
!
!
B
OOM-
S
ECTION
2:
R
EAR
V
IEW
R
EAR,
B
OOM-
S
ECTION
2
If electric and hydraulic options are installed, perform Step 5.
Otherwise, ignore it.
B
OOM-
S
ECTION
2 (R
EAR VIEW
)
:
S
HOWING
O
PTIONAL
H
OSE
S
HEAVE
If optional electric and hydraulics are installed, attach hoses and
electric cable now.
F
ORM
N
O.
29702
lllll
544C/544D B
OOM
M
AINTENANCE
1.
2.
3.
4.
5.
6.
7.
→
→
→
→
→
Stage 4
Install the lube fillings to the bearing pad and chain roller assembly.
Connect the chain clevis to boom-section 2.
R
EAR,
B
OOM-
S
ECTION
2
Assemble the rear bottom chain roller to boom-section 2.
Install the side rear bearing pads.
Note! Do not torque the bolts yet!
Install the optional hose sheave to the right rear of boom-section 2.
Install the standard hose sheave to the rear of boom-section 2.
Attach hoses to the hydraulic sub-assembly of the rear of the boom.
R
EAR,
B
OOM-
S
ECTION
2