beautypg.com

Scheduled maintenance – HP 750 User Manual

Page 39

background image

4-4

Preventive Maintenance

C4705-90000

Scheduled Maintenance

In some segments of the plotter market, the customer tends to print more than the maximum

number plots that the throughput allows, exceeding by far the limit of the design. When this

happens the customer runs into print quality problems and continuous plotter failures.
The purpose of scheduled preventive maintenance is to avoid these failures Ć ensuring a good

performance during all the product life.

Level of Plotter Usage

These are the usage limits of the plotter:

D The service station and spittoons: Limited by the number of spits, wipes and primes

performed which are directly proportional to the number of plots.

D The YĆaxis: The wear of the motor depends on the number of carriage cycles. The levels

of friction can increase due to dust and inkaccumulation on the slider rods.

Given these constraints, preventive maintenance is required when the plotter usage exceeds

the following thresholds:

Number of plots:

20, 000

Number of carriage cycles:

4,500,000

Customers with a normal plotter usage will not require any maintenance.
During the plotter life (5 years, 220 working days per year) normal plotter use means less

than (on average):

20 pages per day in CAD

or

12 pages per day in LFP

Implementation

Two of the EEROM counters are assigned to counting the number of plots and the number of

carriage cycles respectively.
When the plotter exceeds the limits quoted above, the front panel displays the following

message:
Maintenance Advised"
The configuration plot also conveys the usage information, and it is accessible by the user.

Usage Information

Number of plots
Number of carriage cycles