KACO Powador XP100-HV User Manual
Page 21

Operating Instructions Powador XP100-HV
Page 21
I n s t a l l a t i o n / S t a r t - u p
Figure 11: Cabinet (interior view)
Key
1
Circuit breakers CB30 to 35 (PV side)
2
Circuit breakers MCB21 and MCB24 (grid side)
When voltage is present at the inverter, it can be started up. Use the MMI interface screen (located in the left side
of the housing) to start up the inverter.
The inverter begins operation in a specifi ed sequence. For more information, see section 5.1 (“Transporting the
unit to the installation location”) on page 15.
If a fault occurs, the inverter cannot begin operation. For more information on faults, see section 6 (“Faults and
Warnings”) on page 41. For more information on “Fault reset”, see section 9 (“User Interface”) on page 82.
Start up the inverter (fi gure 12)
Display
Check
Action
Error message on the MMI screen
NO
Select the ON button
YES
Reset using “Fault reset"
Select the ON button
NOTE
If the fault cannot be reset using “Fault reset”, please contact our service department.
2
1