Operating Instructions Powador XP100-HV
Page 15
I n s t a l l a t i o n / S t a r t - u p
Floor
•
Must have adequate load-bearing capacity
•
The building material must meet the require-
ments of building material class B1 (“Flame-
resistant Building Materials”, in accordance with
DIN EN 13501-1)
Room
•
Should be as dry as possible
•
Must be indoors (IP 21)
•
The installation location must be climate-con-
trolled in order to dissipate the waste heat
•
Additional ventilation should be provided, if
necessary
•
Do not install in a room where there is a risk of
explosion
Clearance between walls and ceiling
•
Must be accessible for installation and
maintenance
•
Air circulation may not be blocked (fi gure 6)
•
You do not have to provide for clearance on the
sides or to the rear of the unit
•
Minimum clearance between unit and ceiling:
40 cm
Figure 6: Ventilation for the inverter