Operating Instructions Powador XP100-HV

Page 15

I n s t a l l a t i o n / S t a r t - u p

Floor

Must have adequate load-bearing capacity

The building material must meet the require-
ments of building material class B1 (“Flame-
resistant Building Materials”, in accordance with
DIN EN 13501-1)

Room

Should be as dry as possible

Must be indoors (IP 21)

The installation location must be climate-con-
trolled in order to dissipate the waste heat

Additional ventilation should be provided, if
necessary

Do not install in a room where there is a risk of
explosion

Clearance between walls and ceiling

Must be accessible for installation and
maintenance

Air circulation may not be blocked (fi gure 6)

You do not have to provide for clearance on the
sides or to the rear of the unit

Minimum clearance between unit and ceiling:
40 cm

Figure 6: Ventilation for the inverter