beautypg.com

8 coor di na te t ra n s for m ati on cy cle s – HEIDENHAIN TNC 426 (280 476) User Manual

Page 360

background image

HEIDENHAIN TNC 426, TNC 430

333

8.8

Coor

di

na

te T

ra

n

s

for

m

ati

on Cy

cle

s

Combining coordinate transformation cycles

When combining coordinate transformation cycles, always make sure
the working plane is swiveled around the active datum. You can
program a datum shift before activating Cycle 19. In this case, you are
shifting the “machine-based coordinate system.”

If you program a datum shift after having activated Cycle 19, you are
shifting the “tilted coordinate system.”

Important: When resetting the cycles, use the reverse sequence used
for defining the them:

Automatic workpiece measurement in the tilted system

The TNC measuring cycles enable you to have the TNC measure a work-
piece in a tilted system automatically. The TNC stores the measured
data in Q parameters for further processing (for example, for printout).

Procedure for working with Cycle 19 WORKING PLANE

1 Write the program

7

7

7

7

Define the tool (not required, when TOOL.T is active), and enter the
full tool length.

7

7

7

7

Call the tool.

7

7

7

7

Retract the tool in the tool axis to a position where there is no
danger of collision with the workpiece (clamping devices) during
tilting.

7

7

7

7

If required, position the tilt axis or axes with an L block to the
appropriate angular value(s) (depending on a machine parameter).

7

7

7

7

Activate datum shift if required.

7

7

7

7

Define Cycle 19 WORKING PLANE; enter the angular values for the
tilt axes.

7

7

7

7

Traverse all main axes (X, Y, Z) to activate compensation.

7

7

7

7

Write the program as if the machining process were to be executed
in a non-tilted plane.

7

7

7

7

If required, define Cycle 19 WORKING PLANE with other angular
values to execute machining in a different axis position. In this case,
it is not necessary to reset Cycle 19. You can define the new angular
values directly.

7

7

7

7

Reset Cycle 19 WORKING PLANE; program 0° for all tilt axes.

7

7

7

7

Disable the WORKING PLANE function; redefine Cycle 19 and
answer the dialog question with NO ENT.

7

7

7

7

Reset datum shift if required.

7

7

7

7

Position the tilt axes to the 0° position, if required.

1. Activate the datum shift.
2nd: Activate tilting function.
3rd: Activate rotation.
...
Machining
...
1st: Reset the rotation.
2nd: Reset the tilting function.
3rd: Reset the datum shift.

This manual is related to the following products: