beautypg.com

Recommissioning, Recommissioning at a restart, 7commissioning – Pilz PMCprimo DriveP.01/AA0/4/0/0/208-480VAC User Manual

Page 77: 3 recommissioning, 1 recommissioning at a restart

background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-5

7.3

Recommissioning

7

Commissioning

7.3

Recommissioning

7300

Recommissioning

7-

7.3.1

Recommissioning at a restart

Recommissioning at a restart

7-

Inbetrieb_Neustart

The timing diagram below illustrates the signal sequence of the servo
amplifier and safety card at a restart. The safety card has already been
configured (see "Initial commissioning")

Inbetrieb_Neustart_S1

Servo Amplifier

24 V

X4/1

BTB/RTO

X3B/14,15

L1, L2, L3

X0

X8

Safety Card Sx
24 V

X30/1

SS1 SIL3/Reset

X30/20

Ready

X30/16

STO Acknowledge

X30/5

SS1 Activate

X30/1

Servo Amplifier

STO-ENABLE

HW-/SW-Enable

Enable U, V, W

Motor n

t1 = 15 ms

t2 = 500 ms

t3 = 10 s

t4 > 100 ms

U

0

U

0

U

0

U

0

U

0

1

0

1

0

1

0

1

0

1

0

1

0

1

0

1

0

This manual is related to the following products: