beautypg.com

Output test, 4function description, 2 inputs and outputs – Pilz PMCprimo DriveP.01/AA0/4/0/0/208-480VAC User Manual

Page 24

background image

4.2

Inputs and outputs

4

Function Description

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

4-6

4.2.2.3

Output test

Output test

4-

Funkt_Ausgaenge_Test

The outputs are tested regularly:

Outputs that are switched on are checked via regular off tests.
– Test pulses for outputs that are switched on: see technical details
– Outputs that are switched on are switched off for the duration of

the test pulse.

– The load must not switch off because of the test.

Outputs that are switched off are checked via regular on tests.
– Test pulses for outputs that are switched off: see technical details
– Outputs that are switched off are switched on for the duration of

the test pulse.

– The load must not switch on because of the test.

Testing for shorts

A test is regularly carried out to check for shorts between the outputs.

Timing diagram

1: “1” Signal

0: “0” Signal

t

1

Pulse duration on power-up test (see Technical details)

t

2

Scan time of power-up test under normal circumstances (ca. 200

ms)

WARNING!
When wiring an output with capacitance it is essential to note
the pulse duration, repetition period and scan time of the power-
up test, otherwise the load may switch on unintentionally.

1

t1

t2

t1

t

t2

t1

U

0

This manual is related to the following products: