Rice Lake iQUBE2 Digital Diagnostic Junction Box User Manual
Page 10

6
iQUBE
2
Installation Manual
• For cables with foil shielding, strip insulation and foil from the cable half an inch (15 mm) past the grounding
clamp (see Figure 2-1). Fold the foil shield back on the cable where the cable passes through the clamp.
Ensure silver (conductive) side of foil is turned outward for contact with the grounding clamp.
• For cables with braided shielding, strip cable insulation and braided shield from a point just past the ground-
ing clamp. Strip another half inch (15 mm) of insulation only to expose the braid where the cable passes
through the clamp (see Figure 2-1).
Figure 2-1. Cable Grounding
• For load cell cables, cut the shield wire just past the grounding clamp. Shield wire function is provided by
contact between the cable shield and the grounding clamp.
• Route stripped cables through cord grips and clamps. Ensure shields contact grounding clamps as shown in
Figure 2-1. Tighten grounding clamp nuts.
• Finish installation using cable ties to secure cables inside of indicator enclosure.
Cord grip
Insulated cable
Foil
(silver side out)
Grounding clamp
Shield wire
(cut)
Length of foil before folding
back on cable insulation
Cut insulation here
for foil-shielded cables
Braid
Cut insulation here
for braided cables
NOTE: Install lockwashers
first, against enclosure,
under grounding clamp