Dynojet 250i: Pit Installation Guide User Manual
Page 154

In Ground Model 200iP/250iP Motorcycle Dynamometer Installation Guide
I N D E X
Index-iv
wheel clamp 2-37
RPM pickup 5-5–5-9
connecting 5-5–5-9
primary inductive pickup 5-6
secondary inductive pickup 5-8
S
secondary inductive pickup 5-8
setting tool A-3
specifications 1-5–1-9
starter
routing cable 2-39
using 4-5
starter brace 2-14
status indicator 4-3, 4-6
support arm
anchor placement 2-22
installing 2-23
remove from crate 2-2
T
technical support 1-3
temperature sensor cable
routing
wiring to breakout board 2-42
testing
high pressure blowers 2-47
testing voltages
50 Hz B-9
60 Hz B-4
theta controller
dip switches D-2
power adjustment D-2
power line frequency D-2
power line voltage D-3
replace fuses 4-10
wiring to breakout board 2-42
tie-down straps 1-9
tie-downs 5-4
tire carriage 2-18–2-20, 5-2
carriage plate 2-18
installing 2-20
remove from crate 2-2
tire stop 2-45
cable track adapter bracket 2-45
TUV certification 1-3
W
warnings v
weight 1-5
wheel clamp
closing 4-7
installing 3-17–3-19
maintenance 4-9
opening 4-7
routing cable 2-37
testing 2-47, 3-20
troubleshooting 4-9
using 4-6
width 1-5
WinPEP
finding manuals on 3-1
wiring breakout board
jumpers 2-42
pickup card cable 2-42
temperature sensor cable 2-42
theta controller cable 2-42
Y
your dyno room 1-4
equalizer box 1-4
exhaust extraction 1-4
fire suppression 1-4
intake air fan 1-4
noise control 1-4
Z
zip tube 2-56