Metrohm 751 GPD Titrino User Manual
Page 172

3.2 Remote control commands
751 GPD Titrino
169
3.2.2.
3.2.2.136.
136. IInfo.T
.TitrResults.F
.FixEP.51.V
.51.Value
read only
etc. up to .59
.59
IInfo.T
.TitrResults.p
.pK.61.V
.61.Value
read only
etc. up to .69
.69
IInfo.T
.TitrResults.T
.TempVar.C70
.C70
read only/read+write
etc. up to .C79
.C79
.FixEP: Fix EP with DET, MET resp. Fix V with STAT. C5X corresponds to the fix
volumes X, X = 1...9.
.pK: With DET, MET resp. time with given part of the end volume in s in STAT.
C6X corresponds to X = 1...9.
.TempVar: Temporary variables in TIP corresponding to the assignments in the
submethods.
3.2.2.
3.2.2.137.
137. IInfo.T
.TitrResults.Ti
.TimeWin.81.M
.81.Mean
read only
IInfo.T
.TitrResults.Ti
.TimeWin.81.D
.81.Dev
read only
etc. up to .89
.89
IInfo.T
.TitrResults.M
.MeanRateC80.M
.Mean
read only
IInfo.T
.TitrResults.M
.MeanRateC80.D
.Dev
read only
For STAT: Mean rates and standard deviations in mL/min which have been cal-
culated with linear regression. C80 is the rate calculated over all points of the
measuring point list, C8X are the rates in the time windows X, X = 1...9.
3.2.2.
3.2.2.138.
138. IInfo.S
.StatisticsVal.A
.ActN
read only
IInfo.S
.Statistics.1.M
.1.Mean
read only
IInfo.S
.Statistics.1.S
.1.Std
read only
IInfo.S
.Statistics.1.R
.1.RelStd
read only
etc. up to .9
.9
The current values of the statistics calculation.
$Q sends, e.g.
ActN: Current value of the individual results
"3"
Data for MN1:
Mean: Mean value (decimal places as in result)
"3.421"
Std: Standard deviation (1 decimal place more than in result)
"0.0231"
RelStd: Relative standard deviation (in %, 2 decimal places)
"0.14"
3.2.2.
3.2.2.139.
139. IInfo.S
.SiloCalc.C
.C24.N
.Name
read only
IInfo.S
.SiloCalc.C
.C24.V
.Value
read only
IInfo.S
.SiloCalc.C
.C24.U
.Unit
read only
for .C25
.C25 as for .C24
IInfo.S
.SiloCalc.C26.A
.C26.ActN
read only
IInfo.S
.SiloCalc.C26.M
.C26.Mean
read only
IInfo.S
.SiloCalc.C26.S
.C26.Std
read only
IInfo.S
.SiloCalc.C26.R
.C26.RelStd
read only
for .C27
.C27 as for .C26
The current values from the silo calculations. C26 is the mean value out of the
C24 variables; C27 comes from C25.
$Q sends: