Chapter 2: installation, Chapter objectives, Installing a 1203-gu6 module – Rockwell Automation 1336-GM6 Enhanced DeviceNet Communications Module User Manual
Page 21: Chapter 2, Installation, Chapter
Chapter
2
Installation
Chapter Objectives
Chapter 2 provides the information that you need to install the
1203-GU6 module or 1336-GM6 board. In this chapter, you will read
about the following:
•
Required tools and equipment.
•
Selecting cables.
•
Installing the adapter.
•
Removing the adapter.
How you install the adapter depends on whether you are installing a
1203-GU6 module or 1336-GM6 board. Refer to the following table
for information:
Installing a 1203-GU6 Module
Follow these procedures to install a 1203-GU6 module.
Required Tools and Equipment
To install your 1203-GU6 module, you will need the following tools
and equipment:
•
Enhanced DeviceNet communications module (1203-GU6).
•
Either a 5-pin or 10-pin plug-in connector (supplied with
module).
•
35 x 7.5 mm DIN rail A (Allen-Bradley part number 199-DR1;
46277-3; EN 50022).
•
1/8" flathead screwdriver.
•
Appropriate cables for SCANport and DeviceNet connections.
Refer to the “Selecting Cables” section in this chapter.
Selecting Cables
To connect the 1203-GU6 to the SCANport product and the
DeviceNet network, you must select an appropriate DeviceNet cable
and Allen-Bradley SCANport cable. Use the following information to
select appropriate cables for each connection.
If installing:
Then refer to:
1203-GU6 module
“Installing a 1203-GU6 Module” on page 1
1336-GM6 board