beautypg.com

6 second boom section installation, Second boom section installation – SkyTrak 6036 Service Manual User Manual

Page 53

background image

3-11

6036, 6042, 8042, 10042, 10054

Boom

16. Uncap and connect the hydraulic hoses and attach

to their appropriate cylinder locations.

17. Install the Extend and Retract and Auxiliary (if

equipped) tube assemblies to their appropriate
bulkhead fittings. Secure with tube clamps.

18. Uncap and connect the previously labeled

Attachment Tilt and Auxiliary (if equipped) hydraulic
hoses to their appropriate bulkhead fittings.

19. Inside the rear of the boom, slide the threaded clevis

end (5) of the retract chain down the right side of the
boom. Guide the threaded part of the clevis out
through the hole in the tab on the bottom of the
boom. Pull threaded part of clevis all the way
through tab.

20. Coat the entire threaded portion of the clevis with

multi-purpose grease. Install a flat washer and
locknut onto the clevis. Thread the nut onto the
clevis until the threads are flush with the top of the
nut.

21. Install the bottom wear pads to the first boom section

with the previously used hardware.

3.4.6

Second Boom Section Installation

1. At the rear of the second boom section, assemble

the retract chain sheave (6) to the mounting ears on
the right side of the boom. Place the sheave
between the ears and insert the sheave pin from the
left side. Align the hole in the pin retainer plate with
the threaded hole in the left ear. Secure the pin.

2. Apply grease to the grease fitting in the pin. Spin the

sheave by hand to ensure the sheave spins freely on
the pin and to distribute grease evenly.

3. Install the hose reel assembly (7), left side and

bottom wear pads to the rear of the second boom
section.

4. Install the boom side and top wear pads.

5. Grease the sections of the boom in areas where the

wear pads will slide.

MH1461

5

MH1481

6

MH1501

7

This manual is related to the following products: