Setup procedure – HP StorageWorks XP Remote Web Console Software User Manual
Page 95
Each of these sites requires one XP storage system and XP Remote Web Console computers. It is
recommended that Business Continuity Manager should be installed in host computers in each of these
sites.
The following explains hardware configuration for XP storage systems in these sites.
•
XP storage system in the primary site:
• The XP storage system must have TCz Synchronous installed.
• The XP storage system must have URz installed.
• The XP storage system must have a volume used as a TCz Synchronous primary volume and a
URz primary data volume.
• The XP storage system must have a URz master journal volume
• If you use Business Continuity Manager, you need to make settings on the storage system.
Please refer to the Business Continuity Manager uer’s guide for information about settings
required for volume operations in remote sites.
•
XP storage system in the TCz Synchronous secondary site:
• The XP storage system must have TCz Synchronous installed.
• The XP storage system must have URz installed.
• The XP storage system must have TCz Synchronous secondary volume.
NOTE:
This volume will be used for creating a URz pair when disaster recovery is performed at the
primary site.
• The XP storage system must have URz master journal volume.
• If you use Business Continuity Manager, you need to make settings on the storage system.
Please refer to the Business Continuity Manager User’s Guide for information about settings
required for volume operations in remote sites.
•
XP storage system in the UR secondary site:
• The XP storage system must have URz installed.
• The XP storage system must have a URz secondary data volume.
• The XP storage system must have a URz master journal volume.
• If you use Business Continuity Manager, you need to make settings on the storage system.
Please refer to the Business Continuity Manager User’s Guide for information about settings
required for volume operations in remote sites.
Setup Procedure
This section explains the procedure for setting up a 3DC multi-target configuration using TCz Synchronous
and URz.
To set up a 3DC multi-target configuration:
1.
Install TCz Synchronous and URz. Configure ports and journal groups; journal groups must be
configured for storage systems in the three sites.
2.
In the primary site, create a TCz Synchronous pair.
3.
Wait until the status of the TCz Synchronous pair becomes Duplex.
4.
In the primary site, create a URz pair.
When creating a URz pair, be sure to select a value from 1 to 3 as the mirror ID.
5.
Wait until the status of the URz pair becomes Duplex.
If you want to create a URz pair for delta resync operation, go to the next step.
Hitachi Universal Replicator for z/OS user guide for XP12000/XP10000 Disk Arrays and SVS 200
95