Yokogawa Integral Oxygen Analyzer ZR202 User Manual
Page 3

IM 11M13A01-04E
ii
This manual consists of twelve chapters. Please refer to the reference chapters for
installation, operation and maintenance.
T.Int.2E
᭺
᭺
᭺
᭺
᭝
᭺
᭺
᭺
᭝
᭝
᭝
᭝
᭝
᭝
᭝
᭺
᭺
᭺
᭺
᭺
᭺
᭺
Relates to
Chapter
Outline
Installation Operation Maintenance
1. Overview
Equipment models and system configuration examples
2. Specifications
Standard specification, model code (or part number),
dimension drawing for each equipment
3. Installation
Installation method for each equipment
4. Piping
Examples of piping in three standard system
configurations
5. Wiring
Wiring procedures such as “Power supply wiring”, “output
signal wiring” or others
6. Components
Major parts and functions are described in this manual
7. Startup
Basic procedure to start operation of EXAxtZR. Chapter 7
enables you to operate the equipment immediately.
8. Detailed Data Setting
Details of key operations and displays
9. Calibration
Describes the calibration procedure required in the course
of operation.
10. Other Functions
Other functions described
11. Inspection and
How to conduct maintenance of EXAxtZR and procedures
Maintenance
for replacement of deteriorated parts
12. Troubleshooting
This chapter describes measures to be taken when an
abnormal condition occurs.
CMPL (parts list)
User replaceable parts list
᭺
᭺
᭝
: Read and completely understand before operating the equipment.
: Read before operating the equipment, and refer to it whenever necessary.
: Recommended to read at least once.
᭺
᭝
᭝
᭝
᭺
᭺
᭺