beautypg.com

Connecting to the load cells – Fairbanks NexWeigh User Manual

Page 17

background image

Section 3: Installation

04/14

17

51216 -- Rev. 6

3.2.2. Connecting to the Load Cells

Connect the platform interface cable
wires to the terminal strip TB1 on the
Small Block PCB as follows:

Note:

Pin numbers added for clarity.

Note: There are no internal sense jumpers provided. Jumpers must be installed from
+Excitation to +Sense and from –Excitation to –Sense if no sense leads are used.

Reassemble housing and proceed with installation.

NOTE:

Refer to the appropriate Platform Service Manual for the proper interface

wiring color code.

TB1 Pin no.

FUNCTION

1

(−) Excitation

2

(+) Excitation

3

(+) Sense

4

(-) Sense

6

Shield

7

(+) Signal

8

(−) Signal