Outline of installation steps for, Plenumvault digital systems (pvm 220) – Extron Electronics PoleVault Digital Switcher Systems PVS 405D User Manual
Page 81

Outline of Installation Steps for PlenumVault Digital Systems (PVM 220)
Stage 1 — Install the Screen and Projector.
c
Mark the screen location (page 18)
c
Install projector to verify location (page 18
).
c
Verify the image location (page 21)
.
c
Cut the ceiling tile (page 22)
.
c
Preliminary safety hardware installation (page 22)
.
c
Finish projector drop ceiling mount installation (page 23).
c
Secure the projector drop ceiling mount to the ceiling (page 24)
.
c
Install the electrical box (if required) (page 25)
c
.
Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.
c
Install the mud rings (page 29)
c
Pull cables (at the input locations) (page 30)
.
c
Install the wall plates (page 31)
.
c
Install the MediaLink Controller (page 32)
.
Stage 3 — Install the FF 120 Speakers.
c
Cut the ceiling tile (page 36)
.
c
Install the speaker on the drop ceiling (page 36).
c
Terminate the speaker cable for the PVS switcher (page 38).
Stage 4D — Install the PVM 220 and PVS 405D.
c
Remove the device mounting plate from the access door (page 53)
c
Remove ceiling tile and install suspension cables (page 53).
c
Suspend the main PVM 220 enclosure from the ceiling (page 54)
.
c
Run AC power wiring to the AC module in the PVM 220 (page 55)
c
Run signal and control cables to the PVM 220 (page 56)
c
Install devices onto the device mounting plate (page 57)
c
Cut and install ceiling tile into the access door (page 57).
Install the mounting plate onto the access door (page 58)
c
c
Verify and configure the setup (page 59)
.
c
Attach the door tether to the door (page 59)
c
Secure the door latches (page 59)
.
Stage 5 — Configure the PoleVault Switcher and the System.
c
Configure the switcher — PCS Configuration program (page 61)
c
Configure the system — Global Configurator (page 62)
c
c
.
PoleVault Digital Systems • Installation Overview