A. polevault system (pmk 560 pole mount kit), A1. install the pmk 560 base plate, A. polevault system – Extron Electronics PoleVault Digital Switcher Systems PVS 405D User Manual
Page 46: Pmk 560 pole mount kit)

A1. Install the PMK 560 Base Plate.
a. Remove the four cover screws from the center
of the PMK 560 and slide the two halves apart.
Remove them from the base plate.
NOTE: If the PoleVault switcher and its power
supply are already installed, go directly to
step 1d.
b. To mount the PoleVault switcher, place the
mounting plate, with the raised tabs upwards,
on the top surface of the switcher and pass the
two supplied 4-40 x 3/16 inch screws into the
top of the switcher (see figure at right). Secure
the mounting plate but do not overtighten.
Use only the supplied screws to avoid
damaging the switcher.
c. Attach the associated power supply to the base
plate with the supplied tie wraps by passing
them through the appropriate slots and around
the power supply. Tighten until snug
d. Loosen the four pipe collar set screws and slide
the base plate up the pipe until it is touching the
suspended ceiling.
e. Level the base plate and secure it by fully
tightening the set screws.
NOTE:
At least three set screws must come in contact with the pipe.
Å
Attach the mounting plate to the switcher,
û
fasten the power supply to the base plate,
ü
secure
the base plate to the projector pole,
°
and hook
mounting plate tabs into the base plate.
A. PoleVault System (PMK 560 Pole Mount Kit)
•
Where it goes: Attaches to slotted pipe, above the projector and close to the drop ceiling.
•
What it does: Supports and hides the installed PVS 405D switcher and power supply from view.
PMK Covers (2)
Base Plate
To open, remove 4 cover screws
and slide the covers away.
Mounting Plate
L
R
DO
NOT
GR
OUND
OR
SH
ORT
SPE
AKER
OUTPUTS
4/8
Ω
3A M
AX
POW
ER
12V
HDMI
1/2
SIG
LINK
SIG
LINK
3/4
INPU
TS
OUTPU
T
AUD
IO
OUT
PVS 405S
A IP
AMPL
IFIED AUDIO
OUT
PAGI
NG
SENS
OR
PVT I
N
PVT
IN
L
R
AUX
OVE
R PVT
REMOTE
VOI
CE
LIFT
LAN 1
LAN 2
LA
N 3
INPUT
5
+V
L
R
RS
-232
Tx Rx
IR
S
G
G
Attach the mounting plate
to the top of the
PoleVault switcher.
1b
Hook the combined mounting
plate and switcher into the
base plate and secure with
screws.
Projector
Pole
Attach
Power
Supply
Attach PMK to the projector
pole. Secure the pipe collar
with the four
10-32 set screws.
PVS 405D
Switcher
1c
1d
1f
1e
PoleVault Digital Systems • Installation — Stage 4 (PMK 560 and PVS 405D)
40