SANRAD I3.1.1205 User Manual
Page 39
Chapter 2: Installing the V-Switch 2000
2-11
102
13
Power
Switch
Figure 2-10. V-Switch 2000 Power Supplies
Reconfirm that all storage devices are powered up. Plug the power cable into
the V-Switch 2000 power supply and then into the power source. Push the
power switch to the ON position. The V-Switch 2000 powers up.
The Power indicator LED on the front right of the V-Switch 2000 turns
green.
Each network port 1 Gb indicator LED turns green only if connected to
the network and operating at 1 Gb.
Each storage port indicator LED on the front right of the V-Switch 2000
is green if connected to storage. With FC storage, the LED is green if
connected to storage operating at 1 Gb and amber if connected to
storage operating at 2 Gb.
The fans start operating.
You are now able to initialize the V-Switch 2000.