MVI56-AFC ♦ ControlLogix Platform

Quick Start

Liquid and Gas Flow Computer

User Manual

ProSoft Technology, Inc.

Page 29 of 316

February 25, 2011

2.6

Module Initialization

When the module is powered up for the first time, both the OK and ERR BBRAM

LEDs are illuminated. This indicates that the module is in the Cold Start state and

is not yet ready to perform calculations. The following steps initialize the module:
Enable at least one meter
Set the processor to RUN mode
After these two steps are accomplished, the state is changed from Cold Start to
Released. This indicates that that module is ready to perform flow calculations.

When in the Released state, the OK LED is ON and the ERR LED is off.
When the module is ready, you will use AFC Manager to monitor meter

operation, archives, and events. The AFC Manager User Manual contains

detailed information on these tasks.