beautypg.com

Figure 19 – Welltech Dialogic SS7 Protocols ISUP User Manual

Page 103

background image

Dialogic

®

SS7 Protocols ISUP Programmer's Manual Issue 15

Successful continuity test call

To initiate a continuity test call, the application needs to send a Circuit seized

request to the ISUP module. The Circuit seized request must contain the

Nature of connection indicators parameter with the Continuity check indicator

set to “continuity check required on this circuit”. At the same time as the
Circuit seized request is sent, the application must apply the transceiver to

generate the tone and start timer T24 (waiting for sending COT on receipt of

backward check tone) to await completion of the continuity check.

Once the continuity test has completed successfully, the transceiver should

be removed and the call should be released.

Figure 19. Example of a Successful Continuity Check Request Message Sent

SZE

REL

REL

RLC

RLC

CCR

ISUP

MODULE

USER

APPLICATION

NETWORK

103