Hypertherm HTA Rev 6.00 Install Guide User Manual
Page 146

134
Installation & Setup Guide
3) Clamp and Unlock all carriages and G00 index inward on transverse
(optional command - may used to space all stations away from edge / OT switch of machine)
4) Lock and Unclamp all and G00 index to space first station (remember-first station has no
clamping/locking on board)
5) Unlock and Clamp next station and G00 index to space next station.
6) Repeat 5 above until as many stations as needed are spaced.
Note: Homing will also automatically include the commands necessary to push the stations to the side
and lock / clamp them whenever the transverse is homed, if Auto Torch Spacing is enabled.
Unclamp/ Clamp and Unlock / lock commands execute a one second delay before moving.
CNC
Gantry
Cutting
Table
1
2
3
4
CNC
Gantry
Cutting
Table
3
4
1
2