beautypg.com

Hardware preparation and installation – Artesyn MVME51005E SBC Installation and Use (July 2014) User Manual

Page 34

background image

Hardware Preparation and Installation

MVME51005E Single Board Computer Installation and Use (6806800A38D)

36

7. If you intend to use PPCbug interactively, connect the terminal that is to be used as the

PPCbug system console to the DEBUG port on the front panel of the MVME5100.

Note: In normal operation, the host CPU controls MVME5100 operation via the VMEbus
Universe registers.

8. Replace the chassis or system cover(s) and cable peripherals to the panel connectors as

required.

9. Reconnect the system to the AC or DC power source and turn the system power on.

10. The MVME5100’s green CPU LED indicates activity as a set of confidence tests is run, and

the debugger prompt PPC6-Bug> appears.