3 requirements – Artesyn ATCA-F125 Installation and Use Guide (April 2014) User Manual
Page 24

Hardware Preparation and Installation
ATCA-F125 (6873M Artwork) Installation and Use (6806800J94J)
24
Shipment Inspection
1. Verify that you have received all items of your shipment:
Safety Notes Summary
ATCA-F125 blade
Any optional items ordered
2. Check for damage and report any damage or differences to customer service.
3.
Remove the desiccant bag shipped together with the blade.
2.3
Requirements
This section shows the environmental and power requirements of the ATCA-F125 (6873M
Artwork).
The blade is thoroughly inspected before shipment. If any damage occurs during
transportation or any items are missing, please contact customer service immediately.
Environmental Damage
Improper disposal of used products may harm the environment.
Always dispose of used products according to your country’s legislation and
manufacturer’s instructions.