beautypg.com

EXFO IQS-8500 Series for IQS-600 User Manual

Page 93

background image

Creating and Starting a Test Case

Ethernet and Fibre Channel Application

79

EtherSAM (Y.1564) Test Case

6. Services must be enabled before starting the test. For enabling Services

and for additional configuration parameters, refer to EtherSAM Tabs on
page 325.

7. Press the Start button to start the test.

At least one of the EtherSAM (Y.1564) sub tests (Service Configuration
Test
or Service Performance Test) has to be enabled to start the test.
The sub-tests that are enabled will be performed following this order:
Service Configuration Test and Service Performance Test.

8. For additional results, refer to EtherSAM Tabs on page 325.

This manual is related to the following products: