EXFO IQS-8500 Series for IQS-600 User Manual
Page 83
Creating and Starting a Test Case
Ethernet and Fibre Channel Application
69
Introducing the Test Setup
Test Setup Controls:
Back returns to the previous configuration step allowing to see,
change or delete what had been selected.
Next switches to the next configuration step. The Next button is
only available when selection(s) from the Data Path Selector
and/or the Grid has been made.
Delete deletes the current path node.
Finish/Setup:
Finish completes the configuration and creates the test case. The
current window settings are only accepted if the selection has
been made from the Grid view. Default parameters will be used
for the remaining wizard steps. Thus, pressing Finish for BERT test
will automatically add a pattern at the end of the test case structure
if not already selected.
Setup is displayed instead of Finish once the test is created
allowing to return in setup mode. Setup is not available when the
test is started (running).