beautypg.com

EXFO IQS-8500 Series for IQS-600 User Manual

Page 84

background image

Creating and Starting a Test Case

70

FTB-8500 Series and FTB-8120NGE/8130NGE

Introducing the Test Setup

The test path is created through the configuration of each layer that must
be crossed by the signal under test. The test path can contain the following
steps depending on the test application type:

For IQS-8510B:

For IQS-8510G:

For IQS-8120NGE/IQS-8130NGE and IQS-8525/IQS-8535:

This manual is related to the following products: