Index – Reznor MAPS II Unit Installation Manual User Manual
Page 62

Form I-MAPS II, Page 62
Index
A
APPENDIX 58
B
Blower Motors 26
Blower Pulley 24
C
CHECK-TEST-STARTUP
Checklist - Startup 53
Checklist After Startup 56
Clearances 9
Combustion Air 48
Combustion Air Proving
Switch 49
Compressor Staging 26
Condenser Fan 26
Controls, Damper 34
Control Wiring 25
Cross-Reference by Model/
Size and Cabinet Size
Curb (Option CJ31) Assem-
Curb Heater Section, Model
JHUP 250 17
D
Damper Linkage 35
Digital Control Systems 28
Dimensions - Downflow
Roof Curb Option CJ31
Discharge Temperature Sen-
Disconnect Switch 25
Drives 22
Duct Connections 18
Duct Furnace Curb Section,
Model JHUP-0250 50
E
Electric Heat Section 51
Energy Recovery 34
Exhaust Fan Relay 33
F
FX05 Controller 28
FX06 Controller 28
G
Gas Capacity Controls 41
Gas Connection 40
Gas Heat Module 39
Gas Piping and Pressures
Gas Pressure Safety
Switches 46
Gas Train 41
H
HAZARD INTENSITY LEV-
High Altitude Capacity 44
High Temperature Limit
Control 49
Hood 20
Horizontal Airflow Roof Curb
Hot Gas Bypass 28
I
Inlet Air Control 34
Inlet Air Hood 20
Installation Codes 4
L
Lifting 17
Location of Standard and
Optional Controls 32
M
Model JHUP-0250 duct fur-
nace curb section 50
Blower Motor 26
O
Option AG55 41
Option AG57 42
Optional 6:1 Turndown 42
Option D12A 28
Outside Air Relative Humid-
ity Transmitter 29
P
Power Exhaust (Building) 38
Pressure/Temperature Chart
Pressure Null Switch 35
R
Rating Plate 5
References 63
Remote Console 31
Rigging 17
S
Sensor Relocation 30
Shipped-Separate Accesso-
Signal Conditioner 42
Smoke Detector 34
Space Air Sensor, Option
Subcooling 55
Superheat 55
Supply Wiring 24
T
Through-the-base Electrical
U
User Interface, Option RB2A
V
Valve Outlet Pressure 43
Vent Extension 49
W
Wall-Mounted Space (Zone)
Temperature Sensor 29
Wall-Mount Space Air Sen-
Warranty 4
Weights 9
Wiring Diagram 24