EVCO EVF818P9 User Manual
Page 42

EVCO S.p.A.
EVF818 | Installer manual ver. 1.0 | Code 144F818E104
page 42 of 76
r2
1
500
min
240
duration of time-controlled deep freezing
r3
-99
99
°C/°F (1)
3
temperature-controlled blast chilling end time temperature;
also end temperature of the temperature-controlled soft
deep freezing phase (temperature detected by the needle
probe); see also parameter r5
r4
-99
99
°C/°F (1)
-18
temperature-controlled deep freezing end temperature
(temperature detected by the needle probe); see also
parameter r6
r5
1
500
min
90
maximum duration of temperature-controlled blast chilling;
see parameter r3 also
r6
1
500
min
240
maximum
duration
of
temperature-controlled
deep
freezing; see parameter r4 also
r7
-99
99
°C/°F (1)
0
work set-point during blast chilling; also work set-point
during the soft deep freezing phase (cabinet temperature);
see also parameter r0
r8
-99
99
°C/°F (1)
-40
work set-point during deep freezing (cabinet temperature);
see also parameter r0
r9
-99
99
°C/°F (1)
-20
work set-point during hard blast chilling phase (cabinet
temperature); see also parameter r0
r10
-99
99
°C/°F (1)
2
work set-point during post blast chilling storage (cabinet
temperature); see also parameter r0
r11
-99
99
°C/°F (1)
-20
work set-point during post deep freezing storage (cabinet
temperature); see also parameter r0
r12
-99
99
°C/°F (1)
5
work set-point during pre-cooling (cabinet temperature);
see also parameter r0
r13
-99
99
°C/°F (1)
15
end temperature of the temperature-controlled hard blast
chilling phase (temperature detected by the needle probe)
r14
10
100
%
60
duration of the time-controlled hard blast chilling phase
(intended as a percentage of the value established with
parameter r1); also duration of the time-controlled soft
deep freezing phase (intended as a percentage of the value
established with parameter r2)