beautypg.com

EVCO EVF818P9 User Manual

Page 42

background image

EVCO S.p.A.

EVF818 | Installer manual ver. 1.0 | Code 144F818E104

page 42 of 76

r2

1

500

min

240

duration of time-controlled deep freezing

r3

-99

99

°C/°F (1)

3

temperature-controlled blast chilling end time temperature;

also end temperature of the temperature-controlled soft

deep freezing phase (temperature detected by the needle

probe); see also parameter r5

r4

-99

99

°C/°F (1)

-18

temperature-controlled deep freezing end temperature

(temperature detected by the needle probe); see also

parameter r6

r5

1

500

min

90

maximum duration of temperature-controlled blast chilling;

see parameter r3 also

r6

1

500

min

240

maximum

duration

of

temperature-controlled

deep

freezing; see parameter r4 also

r7

-99

99

°C/°F (1)

0

work set-point during blast chilling; also work set-point

during the soft deep freezing phase (cabinet temperature);

see also parameter r0

r8

-99

99

°C/°F (1)

-40

work set-point during deep freezing (cabinet temperature);

see also parameter r0

r9

-99

99

°C/°F (1)

-20

work set-point during hard blast chilling phase (cabinet

temperature); see also parameter r0

r10

-99

99

°C/°F (1)

2

work set-point during post blast chilling storage (cabinet

temperature); see also parameter r0

r11

-99

99

°C/°F (1)

-20

work set-point during post deep freezing storage (cabinet

temperature); see also parameter r0

r12

-99

99

°C/°F (1)

5

work set-point during pre-cooling (cabinet temperature);

see also parameter r0

r13

-99

99

°C/°F (1)

15

end temperature of the temperature-controlled hard blast

chilling phase (temperature detected by the needle probe)

r14

10

100

%

60

duration of the time-controlled hard blast chilling phase

(intended as a percentage of the value established with

parameter r1); also duration of the time-controlled soft

deep freezing phase (intended as a percentage of the value

established with parameter r2)