6 completing the installation, Completing the installation -15 – Cabletron Systems 2M46-04R User Manual
Page 39
Completing the Installation
2M46-04R/2M46-04RDC User’s Guide
3-15
4.
Verify that a link exists by checking that the port RX LED is ON
(flashing amber, blinking green, or solid green). If the RX LED is OFF
and the TX LED is not blinking amber, perform the following steps
until it is on:
a.
Check that the power is turned on for the device at the other end of
the fiber optic cable.
b.
Verify proper crossover of fiber strands between the applicable
port on the 2M46-04R and the fiber optic device at the other end
of the fiber optic cable.
c.
Verify that the fiber connection meets the dB loss specifications
outlined in the Cabletron Systems Cabling Guide.
If a link is not established, see
, before
contacting the Cabletron Systems Global Call Center (refer to
, for details).
3.6
COMPLETING THE INSTALLATION
After installing the 2M46-04R and any optional Fast Ethernet Interface
Modules and HSIMs as appropriate, and making the connections to the
network, proceed as follows:
1.
Secure the cables by running the cables along the strain-relief bracket
and tying them to the strain-relief bracket using cable ties.
2.
The 2M46-04R is now ready to be set up through Local Management.
Refer to
access and use Local Management to configure the 2M46-04R.