C.1 required tools, Appendix c, Ibed in – Cabletron Systems 2M46-04R User Manual
Page 137: Er to, To reestab
2M46-04R/2M46-04RDC User’s Guide
C-1
APPENDIX C
OPTIONAL INSTALLATIONS AND
MODE SWITCH BANK SETTINGS
The top cover must be removed to gain access to the mode bank switches
and to install the Fast Ethernet Interface Modules and the High Speed
Interface Modules.
This appendix covers the following items:
•
)
•
Removing the chassis cover (
)
•
Locations, functions, and settings for the mode switches
(
)
•
Installing Optional Fast Ethernet Interface Modules (
)
C.1
REQUIRED TOOLS
You need the following tools to perform the procedures provided in this
appendix:
•
Antistatic wrist strap
•
Phillips screwdriver
ONLY QUALIFIED SERVICE PERSONNEL SHOULD
ATTEMPT THE FOLLOWING PROCEDURES.
NUR QUALIFIEZIERTE SERVICE PERSONNAL DIE
FOLGENDE PROCEDURE FOLGEN SOLLTEN.
SOLAMENTE PERSONAL CALIFICADO DEBE INTENTAR
ESTE PROCEDIMIENTO.