beautypg.com

Metrohm 833 IC Liquid Handling Unit User Manual

Page 28

background image

3 Basic instrument

833 IC Liquid Handling Unit / Instructions for Use 8.833.1003

20

4 Attach coupling to pump tubing

Attach PEEK coupling 18 to the aspiration end of pump

tubing 19 for both channels (see Fig. 7).

Mount

PEEK coupling 21 with the tubing security device

(6.2744.160) to the delivery end of pump tubing 19 for both

channels.

This is done by dismantling the tubing security device and

first pushing the sleeve nut and the compression piece onto

the tubing.

Attach the tubing to the PEEK coupling and screw the sleeve

nut onto the coupling in order to secure the tubing.

5 Mounting of filter unit

If contained in the standard equipment (see Section 10.2

Standard equipment), screw 6.2821.120 PEEK filter unit 22

onto PEEK coupling 21 (6.2744.160) by using two PEEK

compression fittings 17 (6.2744.010) and a piece of

aspiration tubing/capillary 16 (6.1803.0X0) at the delivery end

of pump tubing 19.


Setting the contact pressure correctly:
Press contact lever 5 until the solutions are just aspirated. Then press

the contact lever up by 1 further click to achieve the optimum contact

pressure.

1 Remove tubing cassettes

Loosen the two tubing cassettes 4 by pressing in spring lever

7 of holding clip 6 and unhinge them from holding pin 2 of

the 833 IC Liquid Handling Unit (see Fig. 1).

2 Insert pump tubing

Press contact lever 5 on the two tubing cassettes down as far

it will go.

Insert pump tubing into each tubing cassette as shown in

Fig. 7.

Stopper must click into position in the corresponding holder

on the left-hand side of the tubing cassette.

3 Attach tubing cassettes

Hinge the tubing cassettes on holding pin and press down

on the right –hand side until spring lever clicks into position

in holding clip 6. Take care that the pump tubing does not

kink.