2 installation, 1 instrument setup, 1 packaging – Metrohm 833 IC Liquid Handling Unit User Manual
Page 19: 2 checks, 3 location, 4 arranging the instruments, Installation, Instrument setup, Packaging, Checks
2.1 Instrument setup
833 IC Liquid Handling Unit / Instructions for Use 8.833.1003
11
2 Installation
2.1 Instrument
setup
2.1.1 Packaging
The 833 IC Liquid Handling Unit and its separately packed accessories
are supplied in very protective special packaging. These contain
impact-absorbing plastic foam linings contained inside a blue plastic
film; these are molded to fit the individual components. The instrument
itself is contained in a dustproof evacuated polyethylene bag. Please
store all this special packaging; it is the only way in which the safe
transport of the instrument can be guaranteed.
2.1.2 Checks
Please check that the delivery is complete and undamaged
immediately on receipt (compare with delivery note and list of
accessories given in Section 10.2). If transport damage is evident
please refer to the information given in Section 10.5.1 "Warranty".
2.1.3 Location
Place the instrument on a vibration-free bench in a favorable position
for operation and protected from corrosive atmospheres and
contamination by chemicals.
2.1.4
Arranging the instruments
Other IC instruments (e.g. 818, 819, 820) can be stacked on top of the
833 IC Liquid Handling Unit. It is best to place it beside the modular IC
system or at the bottom of the stack.
The 833 IC Liquid Handling Unit should always be at the bottom so
that any leaks which may occur in the pump tubing or connections
cannot cause any great damage by escaping liquids (e.g. acids).