beautypg.com

Confirm the installation – Rockwell Automation 1768-L45S Compact GuardLogix Controllers User Manual

Page 25

background image

Rockwell Automation Publication 1768-UM002C-EN-P - April 2012

25

Install the Controller

Chapter 2

3.

Slide the bus lever to the left to lock the modules together.

4.

Attach the end cap by using the tongue and groove slots (a) and locking the
bus lever (b).

Confirm the Installation

After you have installed the controller and applied power, check that the PWR
and I/O PWR status indicators are solid green.

If the indicators are in any other state, see

Troubleshoot System Power on

page 120

.

ATTENTION: When attaching I/O modules, it is very important that the
bus connectors are securely locked together for proper electrical
connection.

a.

b.

a.

Power

OUT

L1

L2/N

This manual is related to the following products: