Section 3 boom, 1 boom assembly – SkyTrak 6036 Service Manual User Manual
Page 19
![background image](/manuals/546101/19/background.png)
Model 6036 S/N 9B0499 and Before
3-1
Section 3.
Boom
CONTENTS
Par.
Title
Page
3.1
BOOM ASSEMBLY
3-1
3.1.1
Inner Boom Replacement
3-1
3.1.2
Intermediate Boom Replacement
3-3
3.1.3
Outer Boom Replacement
3-5
3.1.4
Chain Replacement
3-9
3.1.5
Chain Lubrication
3-10
3.1.6
Chain Tension Check
3-10
3.1.7
Chain Tension Adjustment
3-11
3.1.8
Wear Pad Replacement
3-11
3.1.9
Hose Tensioning
3-12
3.1.10
Long Term Storage Preparation
3-13
3.1.11
Boom Lubrication Points
3-13
3.2
EMERGENCY
BOOM LOWERING
3-13
3.2.1
Loss of Engine Power
or Hydraulic Pump Failure
3-13
3.2.2
Hydraulic Line Failure
3-14
3.3
QUICK ATTACH ASSEMBLY
3-15
3.4
TROUBLESHOOTING
3-16
3.5
SPECIFICATIONS
3-17
SECTION 3
BOOM
EXTEND CHAIN
INTERMEDIATE BOOM
OUTER BOOM
GOOSENECK
INNER BOOM
BOOM EXTEND/RETRACT CYLINDER
RETRACT CHAIN
Fig. 3.1 Boom Assembly
REAR BOOM COVER
3.1
BOOM ASSEMBLY
The boom assembly, Fig. 3.1, consists of inner,
intermediate, and outer booms. The intermediate
boom slides in the outer boom and the inner boom
slides in the intermediate boom. As the boom
extend/retract cylinder extends or retracts the
intermediate boom, a pair of extend chains and one
retract chain moves the inner boom in the same
direction.
IMPORTANT: The inner, intermediate and outer
boom replacement instructions in paragraphs 3.1.1
through 3.1.3 must be completed in sequence.
Replacement of two or more booms as a unit
requires special considerations that are not covered
in these instructions.
3.1.1 Inner Boom Replacement
a.
Removal
1.
Park forklift on level surface, engage park lock
and retract boom.
MA0011