Method 2 - Field Proving Technique

In situations where the meter’s accuracy curve is not

provided by the manufacturer, Multi-Point Calibration

must be performed by proving the meter at various flow

rates.
1. Ensure the LectroCount is in Calibration mode. This

is accomplished by removing the switch plate and

rotating the red selector switch counterclockwise to

the 6 o’clock position.

2. Verify

Linearization Mode is set to Setup.

3. Start a proving run by pressing the

START/RESUME

Key. Monitor

Screen 10f: Product Calibration during

this proving run. The meter should be running at

normal high flow rate.

Flow Rate field displays the

current flow rate of the meter.

4. When prover is full, press

PRINT/END Key on

keypad.

5. Move pointer to

Prover Qty and press ENTER to open

a field edit window and enter exact quantity shown in

the prover.

6. From

Screen 10f: Product Calibration, move pointer

to

Point Number and press ENTER Key to open a

list box window and verify

Linearization Point is set

to

1. Press ENTER.

7. Press

START/RESUME to begin a new prover run at

the same flow rate as Step 3. Note the maximum flow

rate observed during the proving run. When prover

is full, press

PRINT/END.

8. Move pointer to

Prover Qty and press ENTER to open

a field edit window and enter exact quantity shown in

the prover. When this is entered, the

Percent Error

field will update to show calculated error for that flow

rate.

9. Move pointer to

Flow Rate and press ENTER to open

a field edit window and enter the maximum flow rate

observed during the run. Press

ENTER.

10. Move pointer to

Point Number and press ENTER to

open a list box window and select next point number,

2.

11. Begin a second prover run at a different flow rate.

Press

START/RESUME and monitor the display for

maximum flow rate for the run. When prover is filled,

press

PRINT/END.

12. Move pointer to

Prover Qty and press ENTER to open

a field edit window and enter exact quantity shown in

the prover. When entered, the

Percent Error field

will update to show the calculated error for that flow

rate.

Multi-Point Calibration

When

Point Number programming is complete, move

pointer to

Linearization Mode and press ENTER to open

the list box window with options

Applied and Setup. Move

pointer to

Applied and press ENTER.

This puts Linearization algorithm into effect. If error

message

ADJACENT POINTS OUT OF 0.25% RANGE

is displayed,

Applied function will not take effect. The

Linearization Points will need to be re-selected to ensure

no two adjacent points, based on flow rate, are more

than 0.25% apart in their corresponding

Percent Error

fields.
Field prove the meter using the method described for

Single-point Calibration. Assuming data provided by

manufacturer is correct, it should be possible to fill a

prover at any flow rate within the linearized range and

obtain near perfect accuracy.
When

Setup is selected for Linearization Mode, the

algorithm is not activated.

Setup should be used during

the multi-point calibration process.

Applied is used after

the multi-point calibration process is completed.

Method 1 - Continued