beautypg.com

FlexLink XT (макс. 30 кг) Тех. обслуживание User Manual

Page 30

background image

2002-12-11

30

7 Use drill fixture 3923584 to drill the rivet holes.

Place it so the new hole is about 20 mm behind

the mark for the old hole, then turn the handle to

lock it in position (never use the old rivet holes).

8 Drill new holes for the rivets using a 3,2 mm drill.

9 Countersink the holes to ensure that the top of

the rivet is below the surface of the slide rail.

10 Fit the rivets in the holes and press them

together with the rivet tool.