Transfer units XTPT
Recommended inspection interval
Inspection is recommended every 1500 operating
hours or every 3rd month depending on which case
that occurs first.
Check wear or damage of conveyor chain
1 Run the transfer to inspect the whole chain.
Example of damage to look for is listed below:
A) Wrong chain pitch or broken top plate.
B) Non-plain chain.
C) Worn out top plates, min. thickness (t) 1 mm.
2 If any links or chain has to be replaced, see sec-
tion “Replace chain on XT Compact conveyor
Check speed of lift and lowering movement
1 Run the transfer with loaded pallets
2 If necessary, adjust the throttle valves (D) at the
bottom of the unit.
Other observations
Use “Trouble shooting” on page 62.
Cleaning conveyor chain
Only warm water (50ºC), with soap if necessary, may
be used for cleaning conveyor chains.
Other instructions
on page 51
“Replace driving belt on
Spare parts
To find correct spare parts, see separate Spare Parts
documentation.