beautypg.com

2 what to do, What to do – Sun Microsystems Sun Fire X4200 User Manual

Page 45

background image

Chapter 3

SP Initial Setup

3-5

3. Unpack your server and connect the system power cable to a power source.

Refer to the Sun Fire X4100 and Sun Fire X4200 Servers Setup Guide (819-1155 for
instructions on installing the hardware, cabling, and powering on.

3.2.2

What To Do

1. Connect a serial cable from the RJ-45 SERIAL MGT port on the server’s back

panel to a terminal device. See

FIGURE 3-3

.

FIGURE 3-3

Serial Management Port

Note –

The serial port on the ILOM Service Processor requires that the serial cable

connected to it use the same pin assignments as the serial cable connector for the
Sun Advanced Lights Out Manager (ALOM) or Remote System Control (RSC). See

TABLE 3-3

.

2. Press Enter on the terminal device to establish a connection between that terminal

device and the ILOM SP.

TABLE 3-3

Serial Management Port Pinouts

Pin

Signal Description

1

Request To Send (RTS)

2

Data Terminal Ready (DTR)

3

Transmit Data (TXD)

4

Ground

5

Ground

6

Receive Data (RXD)

7

Data Carrier Detect (DCD)

8

Clear To Send (CTS)