beautypg.com

Connecting the system to the mains, 5 connecting the system to the mains, 46 operating manual – FUJITSU PRIMERGY BX600 S3 User Manual

Page 46: Caution, Bx600 s3

background image

46

Operating Manual

BX600

S3

Connecting the System to the Mains

Installing the Hardware

©

c

ogn

it

a

s

.

G

e

s

e

lls

c

h

ft

f

ü

r T

e

c

h

ni

k

-D

o

k

u

m

e

n

ta

ti

on m

b

H

20

09

P

fad

:

H

:\

A

p

ri

l\

P

R

IM

E

R

GY

_R

eb

rand

in

g

\v

o

n W

a

lt

er

\b

x

600

_s

3_

ba\

B

X

6

0

0

S

3

_

e

n

\b

la

d

e

-u

s.

k0

4

4.5

Connecting the System to the Mains

There are slots for four hot-swappable 2100 W power supply units on the rear
of the basic unit. The base system is equipped with two power supply units.

V

CAUTION!

Make sure you observe the information on determining how many
power supply units are required (see

chapter “Power Supply

Concept” on page 125

).

Due to the high power requirements of the BX600 S3 blade server,
you must be careful when arranging the power cabling. Please notice
the information that purpose in

section “Notes on power cabling” on

page 126

).

The power supply units switch on automatically at a mains voltage
between 200 - 240 V. The basic unit may only be commissioned if the
local mains voltage is within the voltage range of the system.

The 2100 W power supply units may only be connected to 16 Amp
grounding outlets, a power distribution unit (PDU) or CEE outlets.
When ordering the basic unit, indicate the type of outlet available at
the installation site. This will allow us to supply a cable with suitable
C19 connectors with the order.